Rummeny, Silvan; Waffenschmidt, Eberhard; Günther, Frank; Klenner, Felix; Stankat, Paul Robert:
Emergency Island Operation of a Medium-Voltage Utility Grid with a Large Battery
CIRED 2020 Berlin Workshop Online; Berlin, Germany (Online); 22.09.-23.09.2020
In: IET Conference Publications, Vol. 2020, No. CP767, pp. 565 - 568
2020Essay (Conference) in JournalOpen Access
Faculty of Information, Media and Electrical Engineering » Institute of Electrical Power Engineering
Title in English:
Emergency Island Operation of a Medium-Voltage Utility Grid with a Large Battery
Conference
CIRED 2020 Berlin Workshop Online; Berlin, Germany (Online); 22.09.-23.09.2020
Author:
Rummeny, SilvanTH Köln
DHSB-ID
THK0002560
SCOPUS
57204974287
Other
person connected with TH Köln
;
Waffenschmidt, EberhardTH Köln
DHSB-ID
THK0002009
SCOPUS
6602886345
Other
person connected with TH Köln
;
Günther, Frank
SCOPUS
57306209800
;
Klenner, Felix
SCOPUS
57305434900
;
Stankat, Paul Robert
SCOPUS
57306052400
Year of publication:
2020
„Publication Channel“:
Open Access
Scopus ID
Language of text:
English
Type of resource:
Text
Access Rights:
open access
Practice Partner:
Yes
Category:
Research
Part of statistic:
Part of statistic

Abstract:

To achieve a future secure and fully renewable electricity supply, the authors suggest renewable-powered subsystems, which balance demand and supply within their local grid and, in emergency, run in an island operation. The utility of Versorgungsbetriebe Bordesholm (VBB) usually operate their battery energy storage system (BESS) of 15 MWh/12,5 MW realised by RES Deutschland GmbH on the frequency containment reserve (FCR) market. This study shows how the BESS’s power converter bank made by SMA is able to control grid voltage and frequency while switching into island operation without interruption. In addition, it can balance distributed renewable generators (PV and biomass) and the demand of up to 4 MW in Bordesholm during island operation. In preliminary experiments the BESS was able to manage artificial load steps of up to 4 MW without significant disturbances. The final real-word experiment showed that the transition into islanding operation and back is smoothly possible without any voltage disturbances noticed by the customers of VBB. It is a milestone in the energy transition process to be able to uninterruptedly supply the customers of such a utility as VBB only with renewable energy sources and even in case of an upstream grid outage